Beam Reinforcement Rate
Estimates & Quantities · Reinforcement mass and kg/m³ for a beam (with slab flange)
78.1Rate by volume (kg/m³)
39.1Total reo mass (kg)
0.50Concrete volume (m³)
Main bar schedule
Add rows for each bar group. Live calc.
| No. | Bar | Length (mm) | Mass (kg) | ||
|---|---|---|---|---|---|
| 1 | 25.3 |
Breakdown
| Main bars (schedule) | 25.3 kg | 1 group(s) |
| Ties | 13.8 kg | N12 @ 200, 5.0 sets, 3,030 mm/set |
| Total reo | 39.1 kg | / 0.50 m³ = 78.1 kg/m³ |